We allow the pool shell to cure for at least two weeks after shotcrete. It is vital for the new pool shell to be hydrated during these two weeks!
Generally, we start working on tile, coping, and installing your new pool equipment after these steps.
Once this is done, plaster is installed, and your pool is ready to be filled with water.